Rowan Fletcher - Gladspace

Author: Rowan Fletcher

Solar Project’s Tortoise Miscalculation Cost $56 Million and Stopped Construction Cold

Pre-construction surveys at California’s Ivanpah solar facility drastically underestimated the local desert tortoise population, predicting just 32 when nearly 1,000 were actually found. The discovery halted construction for three months and cost $56 million to relocate the tortoises. One microchipped juvenile was later tracked to a surprising location — an eagle’s nest.